The largest Storage Water Tanks in Mushrif project

Dewa signs Dh12b deals for six units
By Shakir Husain, Staff Reporter
Published: March 13, 2008, 00:48


Dubai: Dubai Electricity and Water Authority (Dewa) said yesterday it has signed contracts worth Dh12 billion with local and foreign firms for six electricity generation and water desalination projects.

The deals also involve work on water reservoirs, substations and a pipeline, the authority said.

Dewa managing director and chief executive officer Saeed Mohammad Al Tayer said the new projects will allow the utility provider to cater to rising demand.

By 2020, Dewa's target is to have 20,000 megawatts (MW) of power and 1,000 million gallons of water capacity.

One contract is for the construction of a power and desalination plant at Jebel Ali called 'M Station'.

The M Station package is a combined cycle cogeneration power plant at the cost of Dh6.2 billion.

It comprises six Siemens gas turbines, six Doosan heat recovery steam generators and three Alstom steam turbines. The plant will produce 2,000 MW of electricity when completed around the middle of 2010.

The desalination package shall consist of eight desalination units, each with an output of 17.5 million gallons per day, and four boilers with a total output of 140 million gallons. The project is scheduled for completion in June 2010. The third contract is for the construction of a 20-inch diesel fuel oil (DFO) pipeline from Jebel Ali Free Zone to Aweer Power Station. It will cost Dh155 million.

The scope of work for the project includes all mechanical, civil, cooling, and protection and leak detection systems.

Mushrif project

Another project involves construction of a water reservoir at Mushrif with a storage capacity of 180 million gallons. The Dh620 million contract includes all civil and mechanical work. The reservoir project is expected to be completed by April 2009.

The fifth contract is for the construction of two 400/132 kV substations at Barsha and Nad Al Sheba for a total of Dh816 million.

These facilities are expected to operational by the end of 2009.

Dewa also awarded a contract for a 400/132 kV transformer station at Techno Park to supply electricity the industrial zone and other areas like Dubai Industrial City, Jebel Ali and Airport City. This project will be completed by February 2010.

Green move: New power unit soon

Dubai recently signed a memorandum of understanding with three foreign companies to build its first independent power plant. The $6-billion plant will use fuel from synthetic gas produced through the coal gasification process.

The companies part of the plan are Sino Global International, Skyline Services Group, and Samena Power and Energy Limited. The process to produce fuel will be conducted at facilities in the US.

A contract is expected to be signed later this year. It will be completed in 2011 and generate 2,000 MW of electricity.

"It will provide clean energy and diversify our power production," Al Tayer said.

Dewa will be the sole customer for the plant's output. Final negotiations for the project are yet to be conducted and Al Tayer said Dewa could become a partner in the project.

John KIM

2008년 1월 19일 토요일

Hall-Woolford Tank Company






Company History

Hall-Woolford Tank Company was established in 1854. Considered leaders in our industry, our goal is to continue manufacturing, servicing, installing and inspecting wooden tanks the way it has always been meant; with care, quality and craftsmanship. Our firm employs only the very best. Muliti-generations of tank builders are still with us today.

Producing high volume of tanks per year, our yard is continuously being replenished with the highest quality tank stock lumber. Particular attention is focused on raw material to meet rigid specifications. Experienced craftsman select the right material to meet each customers needs. Although wood tanks all look the same when new, the quality of the lumber will determine the longevity. At Hall-Woolford, a special relationship with lumber suppliers has been forged. They understand our devotion to customer's needs, and have satisfied our commitment to providing only the finest lumber for each and every application. We've lasted the test of time because our customers come first!

Corrosion and abrasion resistant
Reliable
Long-lasting
Self insulating
Minimum Maintenance

Services

The benefit of being in business since 1854 is the best service Hall-Woolford can offer. Throughout our long history we've helped customers grow, prosper, enjoy, and have the confidence that the service we provide is the best in the business. The experience and types of situations we've seen cannot be matched by anyone. We work along with you or your staff to plan, execute and complete your project in a timely manner. W e stand ready to provide the following services:

Tank, hot tub, planter manufacturing
Tank installation
Tank inspections
Tank repair
Fabrication of industrial wood products
Supply tank accessories
Liner installation
Erection and service crews traveling to any port of call
prompt and accurate quotations
Consultation
Evaluation of historical wooden tanks

Products
Tank Accessories
Tank Liners
Planters
Hot Tubs

Our yard is well stocked to produce tanks on demand. We carry the following species of lumber:

Tank stock, kiln dried, Alaskan Yellow Cedar
Tank grade, kiln dried, Clear All Heart Douglas Fir
Tank stock, kiln dried, Western Red Cedar
Tank grade, air dried, Clear All Heart California Redwood
Tank grade, air dried, Atlantic White Cedar
FAS, White Oak
Red Cypress

Species are selected to perform the best with each application. We consult with you and decide what type of wood is best suited to your service.

A-36 mild steel hoops are used. Depending on you application we will select material as follows:


-Black Iron
-Hot dipped galvanized
-PVC sheathed hoops
-On special applications, Stainless Steel
-Sizes range from 3/8" diameter to 1-1/4" diameter

Tank lugs (hoop section connectors) are supplied with similar finish as the hoops. The PVC lugs are coated and baked. The fasteners are Hex Heavy Nuts supplied in finishes consistent with the hoop material.


--------------------------------------------------------------------------------

Tank Accessories
For your needs the following tank accessories are in stock:
-Plumbing connections
-Automatic level control switches
-Float valves (ball cocks)
-Pipe fittings
-Interior wood ladders
-Outside steel ladders (with finishes to meet your service)
-Ladder brackets, goose necks, mounting clips
-Ladder safety climb device, and ladder climb lock out
-Liquid level gauge boards
-Tank heads, flat covers, conical covers, sloped covers, or covers by design
-Custom fabricated metal and wood parts